Startings of a covered storage area for kayaks, rowboat+trailer and workboat trailer, as well as to get other equipment out of the rain. These pictures from the island are posted to aid our communication between me (in Camrose), Don and Roger (on the island), and Daryl (in Edmonton). Ground leveling, and concrete pilings are laid, posts are appearing. It is being built in-between trees, and will have one living tree in the center.
July 31, 2014 update. More progress with depicting ideas, by Daryl.
July 14, 204 update. Daryl pointed out that there just isn’t enough space in the spot where I put a chimney on July 12th picture. So new drawings are putting it in a bigger space, further toward the back (closer to the airplane). This would mean, no more “drive through” of tractors. All tractor access would be at the front.
July 12, 2014 update. A few more pics. Thinking about a chimney location.
July 4, 2014 update. A redone diagram, with more accurately measured angles and distances.
June 25, 2014. Ooops. this diagram turns out to be inaccurate. Things that are 90 degrees, aren’t accurately drawn, obviously.
Also notice the new Wagon that built, (fits on the boat), and a concrete mixer and a post-hole-drilling-attachment for the tractor, are also new on the island.