Pictures of progress as the foundation of the boathouse.
February 26, 2015. Foundation finished!
February 16, 2015 update. Another picture of more concrete poured.
February 10, 2015 update. Concrete pour, one section per day.
October 29, 2014. Layout of foundation.
The panorama mode causes straight lines to appear curved.

Standing inside now, here's two different views.
Here's the tree. My builder guys deliberately ignored my explicit instructions about putting the tree outside the foundation.

But there are several loops of one continuous weeping tile tubing wrapped around the tree, with a "incoming" end for water for watering visible beside the tree trunk, and a the far end "drainage" that goes out the far side and somewhat downhill. But the drainage part is buried, not open ended.